Notable Projects

Alabama

  • Replacement of 5.5 miles of 20" pipeline in three locations
  • Remove & replace header inlet and outlet piping on two existing compressors with VFD
  • 48" Slug Catcher & facilities

Georgia

  • Construct meter station & associated tie-in piping together with appurtenances
  • Construct check station & associated tie-in piping together with appurtenances

Louisiana

  • Install 16.9 miles of 36" pipeline with launcher and receiver and 7.9 miles of 24" pipeline with launcher and receiver
  • Install dual 2500 barrel slug catcher
  • Installation of 18,370' of 24" in Calcasieu Parish
  • Horse Power Addition of one 12,000hp turbine compressor
  • Construct 19.2 miles of dual 8" pipeline
  • Installation of 8" isobtane pipeline, dual 6" P/P mix pipelines, and three 8" y-grade pipelines. Included in construction was four splite site block valves, five Reserve Relief Canal block valves, and six Godchaux Canal block valves
  • Installation of a 60" diameter slug catcher & appurtenances
  • Install approximately 2680' of 20" & approximately 37,800' of 16" pipeline & facilities
  • Turnkey installation of two 3606 Cat/Ariel compressor packages
  • Construction & installation of liquid knockout facility
  • Install three 1,250hp & one 350hp vertical can pumps, meter skid manifold area & associated piping
  • Construction & installation of 24" pipeline & dual 36" pipelines
  • Installation of 1900' of 48" pipeline & 3502' of 24" pipeline
  • Installation of 43.2 miles of 12.75" pipeline
  • Installation, construction, & testing of production facility, water intake structure, pipeline, & appurtenances
  • Installation of 64.2 miles of 24" pipeline & 41 miles of dual 12" pipeline